Sunday, April 18, 2010
April 17 2010-Getting the Walkabout Ready
It's that time of the year again. Getting the Walkabout ready for another season of "FISHING". Step 1: Remove the protective winter cover from the boat.
Step 2: Put up the top and the side curtains.
Tuesday, April 13, 2010
April 13 2010-New Construction-Part 3
And here we have a few more pictures of all the new construction at Allport Marina. These pictures were taken on April 2 2010. To begin with, a new sign!
As you can see, the ice has just gone out a couple of days ago. This is the B Dock getting closer to completion.
F Dock now has a roof on and the lights and electrical outlets have been installed. Some of these boat slips will include boat lifts. ( Not yet installed )
Here I am standing on the new section of E Dock (our new summer home ) with the F Dock in the background.
This is a picture of our boat slip as seen from the D Dock. Isn't it beautiful?
Friday, April 09, 2010
April 9 2010-New Construction-Part 2
Tuesday, April 06, 2010
April 6 2010-New Construction-Part 1
Last summer (2009) Allport Marina was sold to new owners. This winter the new owners began a major overhaul. Two new covered boat slips (F) and (B) began construction on the ice. Our dock (E) was being extended to included 6 new slips. As a result we are moving from our old boat slip ( E33 ) out to our new boat slip ( E39 ).
These pictures were taken on Feb 9 2010. This is our new Home. E39.

Subscribe to:
Posts (Atom)